Overview

A riparian buffer is a narrow strip of vegetated land along a body of water. Its main function is to prevent stormwater from harming nearby waters. Despite their simplicity, riparian buffers cause substantial confusion in North Carolina law. Where are these buffers required? Do riparian buffers differ from vegetated setbacks? And why might one North Carolina town have a wider riparian buffer requirement than its neighbor?

A 2015 law limited Noth Carolina local governments’ freedom to require wider riparian buffers, and the extent of this law’s limitations aren’t entirely clear. Additionally, the riparian buffer rules were recodified and changed in 2020. New stormwater legislation in 2026 gives local governments greater flexibility to control stormwater, but the uncertainty surrounding riparian buffers remains. This blog post seeks to untangle the web of riparian buffer laws in North Carolina.

The Purpose of Riparian Buffers

During heavy rains, stormwater flows downhill to nearby bodies of water. As it flows, the stormwater picks up pollutants from the ground, such as sediment, pesticides, and animal waste. Before the stormwater enters the nearby body of water, though, vegetation such as trees and shrubs can absorb the stormwater and reduce the level of pollution entering the nearby waterbody.

The term riparian refers to the area along the bank of a waterbody, like a stream or river, so a riparian buffer is a narrow area of vegetation immediately adjacent to a waterbody. Riparian buffers reduce stormwater-related pollution in our waters. Specifically, riparian buffers effectively absorb phosphorus and nitrogen from stormwater while soaking up excess water. Phosphorus and nitrogen are commonly found in fertilizers and animal waste, and large amounts of phosphorus and nitrogen in waterbodies can cause harmful algal blooms that deplete aquatic oxygen levels, killing aquatic life. Riparian buffers can also serve as habitat for native wildlife.

State rules distinguish multiple zones within the riparian buffer. Zone 1, the zone closest to the water, consists of undisturbed vegetation, such as trees and shrubs. Tree and shrub roots hold soil in place, providing a solid foundation for the edges of the nearby waterbody and reducing erosion. Furthermore, the taller vegetation in Zone 1 shades the adjacent waterbody, preventing temperature variations that could otherwise harm aquatic life. Zone 2 is further from the stream and consists of managed vegetation, where grading and revegetation may be allowed under certain conditions. The managed vegetation in Zone 2 absorbs water and pollutants but visually blends in with the landscape of the surrounding land.

For more resources related to riparian buffers in North Carolina, please visit this North Carolina Department of Environmental Quality webpage that delves into these topics and rules in greater detail.

Area-Specific Riparian Buffer Rules

North Carolina designates six river basins and watersheds as needing special riparian buffer protection: Neuse River Basin, Tar-Pamlico River Basin, Catawba River Basin, Goose Creek Watershed, Randleman Lake Watershed, and Jordan Lake Watershed.  The Tar-Pamlico and Neuse nutrient strategy rules are explicitly implemented to remove nutrients (such as phosphorus and nitrogen) from stormwater, and the Catawba riparian buffer rule is implemented for the removal of pollutants. The Randleman Lake and Jordan Lake riparian buffer rules are each part of broader nutrient strategies to protect those lakes as water supplies. The Goose Creek riparian buffer rules protect an endangered species: the Carolina Heelsplitter freshwater mussel. The North Carolina Department of Environmental Quality maintains a map of areas subject to these rules.

In the applicable areas within the Neuse, Tar-Pamlico, Catawba, Randleman Lake, and Jordan Lake, riparian buffers consist of two zones. Zone 1 is the area adjacent to the waterbody and consists of 30 feet of undisturbed vegetation. Zone 2 consists of 20 feet of managed vegetation next to Zone 1. Grading and revegetation is typically allowed within Zone 2 if it does not compromise the health of the vegetation in Zone 1. In Goose Creek, however, riparian buffers do not contain zones and instead are areas of undisturbed vegetation “within 200 feet of waterbodies within the 100-Year Floodplain and within 100 feet of waterbodies that are not within the 100-Year Floodplain.” 15A N.C.A.C. 02B .0605.

Not all areas within those six river basins and watersheds are required to have special riparian buffer protection, though. In fact, the rules specify which surface waters within these river basins and watersheds must be protected by riparian buffers. Generally, surface waters within these areas should have buffers if they are featured on the latest US Geological Survey (USGS) Topographic map, the most recent published Natural Resources Conservation Service (NRCS) soil survey map, or other approved Environmental Management Commission maps that are more accurate than the USGS and NRCS maps. However, on-site determinations may affect whether a specific surface water is covered. This step-by-step guide should help in determining whether a waterbody is subject to riparian buffer requirements, but close attention must be paid to the applicable riparian buffer rule(s). For example, the mapping identification procedures mentioned above do not apply to the Catawba. Instead, the Catawba riparian buffer rule applies to those areas along “the Catawba River mainstem below Lake James and along the mainstem lakes in the Catawba River Basin.” 15A N.C.A.C. 02B .0614.

Although riparian buffers typically exist as areas of stable vegetation for stormwater control, each set of riparian buffer rules lists certain uses that may be allowed within a riparian buffer. These permissible uses differ by area. For example, bridges are simply listed as “Allowable” within riparian buffers in the Catawba River Basin, but whether a bridge is “Deemed Allowable” within a riparian buffer in the Neuse River Basin or not depends on the bridge’s impact. Additionally, certain uses may only be allowed within a riparian buffer if appropriate authorization is obtained, such as a variance granted by the Environmental Management Commission or an Authorization Certificate issued by the Division of Water Resources. To see whether a certain use is allowed within a riparian buffer, consult the table of uses within the relevant riparian buffer rule.

The Riparian Buffer Protection Program provides flexibility for those circumstances when there is no practical alternative to the loss of a riparian buffer. General Statute (G.S.) 143-214.20 allows the relevant applicant to perform compensatory mitigation instead of strictly complying with the riparian buffer statutes and regulations. In these circumstances, the applicant may pay a fee, donate property, restore or enhance an existing riparian buffer, or complete any other compensatory mitigation option listed under G.S. 143-214.20.

Under G.S. 143-214.23, the Environmental Management Commission may delegate implementation and enforcement of statewide riparian buffer requirements to local governments. A local government may request this authority, and a delegated local government can adopt ordinances and regulations necessary to establish and enforce these riparian buffer requirements. Although G.S. 143-214.23 provides general guidance on this delegation process, the area-specific rules discussed above contain additional information on local government delegation.

Changes to the Riparian Buffer Rules

In 2020, five of the six riparian buffer rules (all except for Jordan) were recodified and changed. The primary purposes of these changes were to incorporate stormwater improvements, to revise outdated requirements, and to clarify ambiguous language. Previous citations and current citations may be compared here. Overall, numerous changes were made to language that pertains to the authorization for certain uses within riparian buffer areas. Other amendments were made to the Table of Uses. An overview of all these changes may be found here.

Vegetated Setbacks Along Waterbodies

While not technically riparian buffers, numerous North Carolina programs require certain developments to maintain vegetated setbacks adjacent to waterbodies. Vegetated setbacks are “area[s] of natural or established vegetation adjacent to surface waters, through which stormwater runoff flows in a diffuse manner to protect surface waters from degradation due to development activities.” 15A N.C.A.C. 02H .1002(51). Although they do not contain two zones, vegetated setbacks serve a similar purpose to riparian buffers of protecting waters from stormwater-related harm. However, different rules apply to vegetated setbacks. Vegetated setbacks may be cleared or graded but must be replanted and maintained, and certain built-upon area may be allowed within a vegetated setback that wouldn’t otherwise be allowed within a riparian buffer. 15A N.C.A.C. 02H .1003(4).

Numerous programs in North Carolina require vegetated setbacks along waterbodies. For example, 15A N.C.A.C. 02B .0624 requires vegetated setbacks along Water Supply Watersheds. Certain projects in coastal areas subject to CAMA must have vegetated setbacks, as well as non-coastal projects along High Quality Waters & Outstanding Resource Waters. Vegetated setbacks may be required in some other circumstances, too, and a future blog post may cover these setback requirements in detail.

Local Authority to Require Wider Riparian Buffers in North Carolina

In 2015, the General Assembly passed G.S. 143‑214.23A, which limits local government riparian buffer authority. The law states that “a local government may not enact, implement, or enforce a local government ordinance that establishes a riparian buffer requirement that exceeds riparian buffer requirements necessary to comply with or implement federal or State law or a condition of a permit, certificate, or other approval issued by a federal or State agency.” There is a narrow carve-out for ordinances implemented prior to 1997 that meet other listed requirements. The law also states local governments may request that the Environmental Management Commission grant them the authority to enact stronger riparian buffer protections.

Of note, the law does not state that riparian buffers must be limited to the width prescribed under the statewide area-specific riparian buffer rules discussed above. Instead, G.S. 143-214.23A states that local riparian buffer requirements may not exceed “riparian buffer requirements necessary to comply with or implement federal or State law or a condition of a permit, certificate, or other approval issued by a federal or State agency.” In 2016, the EMC clarified that G.S. 143-214.23A allows a North Carolina local government to maintain a stronger riparian buffer requirement when that wider riparian buffer requirement is necessary to implement the local government’s NPDES MS4 permit. Over 120 local governments in North Carolina are NPDES MS4 permittees, so the authority to establish wider riparian buffers is not as limited as one may first expect when reading G.S. 143-214.23A. However, this local authority for NPDES MS4 permittees to set wider riparian buffers is not unlimited, as any local requirement for a wider riparian buffer must be “necessary to comply with or implement” the NPDES MS4 permit (or any other relevant state or federal permit, law, certificate, or approval), unless the pre-1997 carve-out applies or the Environmental Management Commission grants permission for a wider riparian buffer.

G.S. 143‑214.23A raises a few questions, though. First, the law defines a “riparian buffer requirement” as a “landward setback from surface waters.” So, does the law also prohibit a local government ordinance from establishing a larger vegetated setback than those listed in the programs above? The provided definition seems to include both riparian buffers and vegetated setbacks. However, North Carolina law treats riparian buffers and vegetated setbacks differently, and the law is titled “Limitations on local government riparian buffer requirements.” It is admittedly ambiguous, but the provided definition of “riparian buffer requirement” leans towards including vegetated setbacks within the coverage (and the limitations) of this statute.

Second, the law defines “local government ordinance” as “any action by a local government carrying the effect of law…whether by ordinance, comprehensive plan, policy, resolution, or other measure.” Some local government actions clearly fit within this definition. Amending the text of a zoning ordinance, for example, would plainly fit within this definition of “local government ordinance” and be subject to this limitation on riparian buffer authority. But conditional rezoning raises a peculiar question: Can a conditional zoning condition—with consent from the landowner—require increased riparian buffers? When a local government approves a rezoning request to rezone land to a conditional zoning district, that approval seems to qualify as a “local government ordinance,” since a conditional zoning decision is a legislative decision. But the authority for conditional zoning, as outlined in Chapter 160D, allows conditions to go beyond general zoning authority with the consent of the landowner. So, if a landowner in a conditional zoning district voluntarily consents to a wider riparian buffer, does this voluntary agreement run afoul of G.S. 143‑214.23A? Even if so, the landowner probably wouldn’t challenge the wider riparian buffer requirement (because they voluntarily agreed to it), but there is some possibility that a subsequent purchaser of that land may challenge the local government’s authority to enforce that wider riparian buffer.

Incentives for Additional Stormwater Control Measures

Although riparian buffers and vegetated setbacks are encumbered by statewide limitations, a recent legislative change to North Carolina stormwater law offers a related, but different, opportunity for flexible stormwater planning. Session Law 2026-32 added G.S. 143-214.7(b8), which allows local governments to “offer nonmandatory incentives that waive building, zoning, connection, or other regulations or fees; provide additional tax and financial benefits; or institute other incentives for development or redevelopment that implements additional stormwater control measures beyond those required by this section and rules adopted thereunder.” Despite the rigid limitations local governments face when it comes to riparian buffers, the ability to offer incentives for additional stormwater control measures equips local governments with another tool to creatively and proactively control stormwater.

Conclusion

Riparian buffers and vegetated setbacks protect waterbodies from stormwater-related pollution, but certain development may be allowed within these areas of vegetation. Statewide law mandates where vegetated setbacks and riparian buffers must be set, and local freedom to impose stricter requirements is restricted and murky. However, G.S. 143-214.7(b8) may allow flexible stormwater planning when local freedom to establish wider riparian buffers feels constrained.